Flovac Vacuum Sewerage Systems

  • Home
  • About Flovac
    • PRODUCTION GROUP
    • ENGINEERING GROUP
    • OPERATIONS GROUP
    • MANAGEMENT
  • How Vacuum Sewerage Systems Work?
    • Vacuum Sewer System Design
    • Vacuum Pump Station
    • Vacuum Interface Valve
      • Valve Blockage Test
      • Engineered Solutions. Flovac Launches New 2 inch Vacuum Valve
    • Collection Pit
    • Vacuum Mains
    • Monitoring Systems
  • Projects
    • Case Studies
    • Septic Tank Replacement Schemes
    • Sewerage Systems for Residential Developers
    • Marina’s and Port Facilities
    • Deployable Sewerage Solutions
  • News
  • Contact Us
  • Choose a Language

Deployable Sewerage Solutions

Flovac provides for a safe easily deployable sewerage solutions with limited power requirements and is low maintenance.

“PLUG n PLAY”

1. VPS; 2. Vacuum Main; 3. Collection Pit; 4. Gravity Line; 5. Deployed Flovac System

1. VPS; 2. Vacuum Main; 3. Collection Pit; 4. Gravity Line; 5. Deployed Flovac System

 

The Flovac deployable Systems can be provided in conjunction with treatment or with camlock fittings to allow for easy access via sucker trucks.

Ideal for camps from 50 people to 5,000

Registered NATO Supplier

  • Mining camps and Fly Camps

  • Refugee and Emergency Centers (incl Covid-19 Hospitals)

  • Event Infrastructure

  • Military Camps

  • Staging of Residential Developments

Temporary Camps, whether emergency, workers accommodation, mining, military or refugee need to transport sewage from ablution blocks, kitchens and laundries. Installation of pipework can be time consuming, expensive and be damaging to the environment.

Camp Bastion Afghanistan

Camp Bastion Afghanistan

Flovac’s deployable vacuum system can be deployed to site and established within 24 hours. Upon redeployment can be packed and ready for transport within 24 hours, leaving the site as you found it.

All infrastructure delivered in re-deployable 20 ft containers, simply install the pipe network, power up the pump station and turn it on

The only power requirement is at the pump station

Collection pipe work can be laid above ground or buried at minimum depth and collects all wastewater within the camp

London Olympics 2012

London Olympics 2012

 

All systems pre-tested and commissioned prior to delivery and suitable for all climates

Can be supplied with containerised treatment plants if required

Also available with pre-constructed ablution blocks containing vacuum toilets to reduce water use in remote camps

No leaks, overflows or odours and all fully automated and monitored

 

 

On the following Links you can find more information via Case Studies or News Articles

 

Under Construction October 2021

 

You Tube Video Library

How Vacuum Sewers Work

Flovac Valve Blockage Test

Vacuum Main Leak Test

Vacuum Valve Easy Access

 

Recent Posts

  • How to identify 5,000,000 litres per year of salt water entering your sewer network at a single glance
  • Key Largo using monitoring for hurricane preparedness
  • The Most Difficult Install Ever, Eretrea Greece
  • Gran Marina del Estrecho, a new marina for megayachts
  • New Vacuum Sewer Project in Portugal

Follow Us!