Flovac Vacuum Sewerage Systems

  • Home
  • About Flovac
    • PRODUCTION GROUP
    • ENGINEERING GROUP
    • OPERATIONS GROUP
    • MANAGEMENT
  • How Vacuum Sewerage Systems Work?
    • Vacuum Sewer System Design
    • Vacuum Pump Station
    • Vacuum Interface Valve
      • Valve Blockage Test
      • Engineered Solutions. Flovac Launches New 2 inch Vacuum Valve
    • Collection Pit
    • Vacuum Mains
    • Monitoring Systems
  • Projects
    • Case Studies
    • Septic Tank Replacement Schemes
    • Sewerage Systems for Residential Developers
    • Marina’s and Port Facilities
    • Deployable Sewerage Solutions
  • News
  • Contact Us
  • Choose a Language

OPERATIONS GROUP

The key to the success of the Flovac Group is the emphasis placed on the importance of the operations group. At every level within the delivery of our projects the operations group plays some part.

  • As an integral part of the design team with insights into hazard and operability studies and current health and safety legislation.
  • As part of the research and development group within production.
  • Site supervision during the construction phase
  • Providing experienced personnel and equipment during commissioning phases.
  • Education programs for contractors, plumbers and operators.

Being part of a global team is a big advantage as we have found that each project has unique challenges and issues not found elsewhere within a country but may have been seen somewhere else in the world.

Flovac Installation Team, Botswana

Some of the critical work undertaken by our operations teams includes:-

  • System Maintenance
  • Tuning and Optimisation
  • Valve and Pump Upgrades
  • Remote Analysis
  • 24 hour Phone Support
  • System Audits
  • Operator Training
  • Asset Management Support
  • Parts Supplies (all systems)
  • Contractor and Plumber Accreditation Courses

 

You Tube Video Library

How Vacuum Sewers Work

Flovac Valve Blockage Test

Vacuum Main Leak Test

Vacuum Valve Easy Access

 

Recent Posts

  • The Largest Vacuum Sewerage System in the Southern Hempisphere
  • How to identify 5,000,000 litres per year of salt water entering your sewer network at a single glance
  • Key Largo using monitoring for hurricane preparedness
  • The Most Difficult Install Ever, Eretrea Greece
  • Gran Marina del Estrecho, a new marina for megayachts

Follow Us!