New FLOVAC Project at the Port of Bilbao, Spain

We are very happy to announce that we have commenced the design and supply of the vacuum sewage system of the Port of Bilbao. The port has taken a big step towards modernizing its sanitation system with the selection of Flovac for phase I of the sanitation project “Muelles Santurtzi y espigón central”. This innovative solution, which addresses the challenges of an area with 40 discharge points and a high-water table, offers an efficient and sustainable alternative without the need for deep trenches. In addition, the system will be equipped with monitoring that will allow the status of the vacuum network to be monitored and controlled effectively. This milestone adds to our revolution of vacuum sewer systems around the world.

In this project we faced a significant challenge in terms of sanitation due to the high concentration of discharge points and a high-water table in the Port of Bilbao. These conditions make the traditional sewerage system inefficient and expensive to implement. This is where Flovac vacuum sewer technology presents itself as a revolutionary solution.

Flovac’ s vacuum sewer system uses the difference in atmospheric pressure to transport waste efficiently and safely. Instead of relying on an underground pipe system, this system uses a smaller diameter pipe network, allowing space constraints to be overcome and the need for deep trenches to be minimized. With a single vacuum point, service can be provided to the entire area of the Port of Bilbao, even along the longest branch of more than 2.5 km.

Flovac Monitoring Systems

In addition, to guaranteeing optimum operation and efficient management of the system, Flovac has integrated its monitoring system. It is an advanced monitoring system that allows you to monitor the status of the vacuum network in real time. With this tool, port authorities will be able to detect any anomaly or blockage, ensuring proactive maintenance and a prompt response to any incident.

Therefore, the choice of Flovac as a supplier for the Bilbao Port sanitation project was based on our experience and proven excellence. The Basque Water Agency and the Bilbao-Vizcaya Water Consortium visited the largest vacuum sanitation facility in Europe, located in Santa Pola. This project has been operational since 2006, to obtain precise and valuable information on the implications both during the construction phase and in long-term maintenance. After this visit, they approved that the vacuum technology chosen was that of Flovacs.

In conclusion, the updated sanitation project for the Port of Bilbao marks an important milestone in the application of vacuum sewerage technologies in Spain. Flovac, as a leader in the sector, has been selected to implement its innovative system in the area of the Santurtzi Docks and central breakwater. We are sure that we will bring an innovative and long-lasting solution while bringing our efficient and sustainable approach to the vacuum sewerage system.

Gold Coast Marina Vacuum Pump Station Upgrade – A Challenge

The Gold Coast Marine Precinct is a dedicated industrial zone in Coomera, on the Gold Coast of Queensland Australia. The precinct supports marine manufacturing, servicing, repairs and refits of recreational boats. It is one of the most advanced and respected marine industry cluster developments in the Southern Hemisphere. It is the only purpose built marine precinct in Australia. Covering 250 hectares, it it is home to some of Australias most prestigious motor yacht builders and industry leaders.

It includes Riviera Australia a winner of Australian Maritime Industry Exporter of the year on multiple occasions.

Maritomo  Handcrafted Luxury Offshore Motor Yachts

The Boat Works – a boatyard, marina and superyacht facility

The Gold Coast City Marina & Shipyard   has over 90 expert businesses looking after a wide range of clients. They have won numerous awards for their facilities.

 

Related: Barcelona Port vacuum Sewerage System

The Challenge

All of the wastewater within the facility is collected via a vacuum sewerage system. Over the years the facility has grown and the requirements of what a sewerage needs to do has changed. How to handle the larger superyachts for example. How to reduce energy costs. And how to ensure that all equipment was the latest technology and would reduce any risks of sewage entering the waterways.

The hardest part of the challenge was to fit new vacuum pump station equipment into a very tight existing space. The upgrade needed to take place with minimal disruption to any of the businesses in the precinct.

Related: Sydney Superyacht Marina Upgrade

As the Vacuum Pump Station is located outside of the precinct’s grounds it is operated and maintained by Gold Coast Council.

Power Saving and Efficiency

The goal set by Council was to reduce the vacuum pump cycle time from around 6 minutes to less than 3 minutes. This would give a 50{f2ac4d1e1d40dc2e2d9280a1dfa90d854b2d8c80eba743affa37fc4ce2e16def} reduction in power usage throughout the day.

There was also a request to increase the discharged flow from the system by 15{f2ac4d1e1d40dc2e2d9280a1dfa90d854b2d8c80eba743affa37fc4ce2e16def} by using exactly the same specified discharge pumps that were currently installed. We managed to increase their flow from 18 L/S to 21 L/S.

Flovac’s engineers worked on the problem creating 3D modeling of the station to ensure that the equipment would fit the space. Then the operations group went over the plans to make sure that the operability of the system would not be compromised.

In the months after commissioning there has been a clear improvement and lowering of energy costs. Vacuum pump run times have decreased from 17 hours per day and are now running for only 6.7 hours per day. They previously had been running 3 x 500 m3/hr pumps most of the day with huge energy costs.

More information on Flovac’s Marina and Port Projects

Flovac Protecting the Environment in Barcelona

Flovac was in charge of the design and installation of a Flovac vacuum sewerage system at the MB92 Port of Barcelona expansion project to collect wastewater and ensure that no environmental damage could occur in the area.

MB92 expands its installations at Barcelona’s port

Marina Barcelona 92 (MB92), a company dedicated to the maintenance and repair of superyachts, was in charge of carrying out the ambitious project to expand the port coastline of Barcelona, in the Port Vell area. The project, started in 2015 and completed in 2019, consisted of the construction of a large surface area in which a new boat lifting system (known as shiplift) would be located, with the aim of grounding yachts of up to 4,000 tons for repair and maintenance. Currently, it is the largest shiplift in the world dedicated exclusively to yachts.

The Project

The project, which involved a total investment of 50 million euros, was completed in August 2019 after 4 years of work. Thanks to the shiplift, customers have more ability than ever to work out of the water, which offers more flexibility, capacity and opportunities when it comes to maintaining and repairing yachts. Since its launch, the shiplift has already carried 22 superyachts with an average of over 75m LOA. It is a feat of world-class civil engineering in the heart of the port of Barcelona.

Raising Capacity

  • Capacity to lift vessels up to 115m LOA.
  • 30,000m2 hard standing area to host up to 9 vessels of up to 115m LOA on dry land
  • Hard standing area includes integrated keel pit with dimensions of 8m depth, 5m width and 14.5m length.
  • Bidirectional rail system to facilitate flexible and more efficient maneuverability of vessels once hauled out.
  • Supply of all essential services such as fresh water and shore power connections.

Flovac Looking after the Environment

Flovac was commissioned to install a vacuum sewerage system in this project in order to collect the wastewater generated by MB92’s activity. The goal of Flovac and the products it offers is to reduce the human footprint. Therefore, one of the main priorities was to guarantee the environmental protection of the area. The installation is made up of 2 independent vacuum networks; one for the wastewater from buildings and yachts, and the other one for industrial wastewater produced from yacht repair. The industrial wastewater is transported to a new treatment plant, at MB92’s own facilities. The facility has 4 tanks with 2 vacuum valves each. Flovac has finished the commissioning this July.

To find out more about Flovac’s port and marina projects you can click here