Flovac Vacuum Sewerage Systems

  • Home
  • About Flovac
    • PRODUCTION GROUP
    • ENGINEERING GROUP
    • OPERATIONS GROUP
    • MANAGEMENT
  • How Vacuum Sewerage Systems Work?
    • Vacuum Sewer System Design
    • Vacuum Pump Station
    • Vacuum Interface Valve
      • Valve Blockage Test
      • Engineered Solutions. Flovac Launches New 2 inch Vacuum Valve
    • Collection Pit
    • Vacuum Mains
    • Monitoring Systems
  • Projects
    • Case Studies
    • Septic Tank Replacement Schemes
    • Sewerage Systems for Residential Developers
    • Marina’s and Port Facilities
    • Deployable Sewerage Solutions
  • News
  • Contact Us
  • Choose a Language

Can the Flovac Valve and Controller work under water

October 9, 2019 By admin

Vacuum sewerage systems are often installed in areas which are prone to flooding and rising water tables. A question we are often asked is

“Can the Flovac Valve and Controller still

Flovac Vacuum Valve and controller operating under water

operate when they are under water”

The simple answer is yes!

The writers of the British and European Standard for Vacuum Sewerage Systems EN16932-3:2018  and the stricter Australian Standard for Vacuum Valves AS 4310 required that a number of independent tests be undertaken. The Blockage test (seen here) and the Submergence test were two of the most important.

The reason is that “A submergence test is conducted to confirm that the valve can be installed in flood-prone areas”  In Annexure A.3 in the European Standard and Appendix F in the Australian standard it outlines what is required for the testing.

The USA does not have any standards for vacuum sewer systems so utilities should rely on other International standards.

The stricter Australian standard requires that the valve, controller and all fittings shall be capable of continuous operation without failure when immersed to a depth of 1,500 mm (5 feet) above the top of the valve body in water and/or floodwaters, which may contain large quantities of sediments. The European standard only requires that the valve is covered by 300 mm of water.

Flovac had independent auditors Dekra carry out all of the testing requirements covered in both standards. Dekra are one of the largest and most respected testing and certification organisations in the world, operating in 50 countries and with 45,000 employees.

The DEKRA Test procedure and P for Pass

Whenever our operations group has found a failure of a Flovac valve or controller at a project site which has been subject to flooding, in all cases it has been due to incorrect installation. Either due to hose clamps not installed or o-rings left off. In areas which are badly affected by flooding we will often install the controller in a dedicated pedestal next to the collection pit. This is not to protect the controller, which can still operate when submerged, but to allow the operator to fire the vacuum valve which might be covered by floodwater.

This video shows a Flovac valve with monitoring operating under water.

For those operators with a Flovac Monitoring System the valve can be fired remotely either via your phone or other IOT device.

If your project is subject to flooding there are a number of other protective measures which can be taken (read this article for more information)

 

Filed Under: Products Tagged With: Dekra, Standards, Vacuum Valve

You Tube Video Library

How Vacuum Sewers Work

Flovac Valve Blockage Test

Vacuum Main Leak Test

Vacuum Valve Easy Access

 

Recent Posts

  • The Largest Vacuum Sewerage System in the Southern Hempisphere
  • How to identify 5,000,000 litres per year of salt water entering your sewer network at a single glance
  • Key Largo using monitoring for hurricane preparedness
  • The Most Difficult Install Ever, Eretrea Greece
  • Gran Marina del Estrecho, a new marina for megayachts

Follow Us!