Project Overview

Client: District Council of Barunga West

Location: Fisherman Bay, South Australia,  a coastal holiday community on the Yorke Peninsula

Challenge: Convert a long-established holiday town from individual septic tanks to a reticulated sewer scheme coping with strong seasonal population swings, minimising disruption to residents, and proving a genuinely better long-term option than the alternatives.

Key Outcomes:

  • Septic tanks across roughly 400 dwellings successfully replaced with a reticulated vacuum sewer network
  • A system chosen for its ability to handle strong seasonal flow swings without oversizing infrastructure for a town that empties out for much of the year
  • Installation completed with minimal disruption to an established town of existing homes and narrow lots
  • Since commissioning, verified operating data confirming low energy use and design accuracy  with full reports linked below

Results

  • Design Accuracy: Since commissioning, measured average flow and air demand have come in within a fraction of a percent of the original concept design, a rare level of agreement between design and reality.
  • Verified Operating Cost: Annual energy consumption confirmed at 7,396 kWh/year via SCADA, at an operating cost of approximately $38 per connection per year. See Energy Consumption Report 
  • Whole-of-Life Value: Over a 30-year horizon, the vacuum system’s whole-of-life cost compares favourably with both gravity and low-pressure alternatives.See Whole of Life Report 
  • Full modelling in the Carbon Footprint Study

Client Testimonial

“The Flovac system has proven to be an excellent solution for Fisherman Bay. Its reliability and efficiency, particularly in the challenging conditions of a low-lying coastal environment, have provided the community with a modern, environmentally friendly, low maintenance and resilient wastewater system that we can rely on for the future.”

Daniel Rowley, Maintenance Coordinator Barunga West Council