Flovac Vacuum Sewerage Systems

  • Home
  • About Flovac
    • PRODUCTION GROUP
    • ENGINEERING GROUP
    • OPERATIONS GROUP
    • MANAGEMENT
  • How Vacuum Sewerage Systems Work?
    • Vacuum Sewer System Design
    • Vacuum Pump Station
    • Vacuum Interface Valve
      • Valve Blockage Test
      • Engineered Solutions. Flovac Launches New 2 inch Vacuum Valve
    • Collection Pit
    • Vacuum Mains
    • Monitoring Systems
  • Projects
    • Case Studies
    • Septic Tank Replacement Schemes
    • Sewerage Systems for Residential Developers
    • Marina’s and Port Facilities
    • Deployable Sewerage Solutions
  • News
  • Contact Us
  • Choose a Language

How to Sewer The Water Villages of Kampong Ayer

July 9, 2018 By admin

Kampong Ayer in Brunei’s capital city of Bandar Seri Begawan is a cluster of around 40 small villages connected by a 38-kilometer (23-mile) boardwalk. It dates back more than 600 years. Today, around 13,000 people live in the water village, about 3% of the country’s population.

Kampong Ayer Brunei

These Water Villages are very common throughout South East Asia down as far as PNG which has a large water village just outside of Port Moresby at Hanuabada.

Many of these villages have enormous cultural and historic value to the countries and communities that live in them. They are also major drawcards for tourists with the Kampong Ayer townships in Brunei known as the “venice of the east”

Although some of the houses are now on vacuum sewer networks, many have still not been connected. Historically having raw sewerage drop into the water below only really affected the health of the local population as many of the water people swam or fished in the same water. With the wealth of those living in the villages increasing, more problems have surfaced with detergents entering the waterways, killing off the fish and other local seafood. None of this is good for tourism, especially the odour.

The government has big plans to increase many of the houses serviced but are also finding the structural integrity of many of the houses to be a problem. Imagine laying a length of pipework between houses to pick up the sewage when the house in the middle collapses due to age.

How these houses get serviced is a very complex problem. At one of the water villages in Labuan Malaysia a gravity system was installed but proved to be a failure within a short amount of time.

The pipework sloping to a gravity main below the houses close to the surface of the water was cut many times by local residents as it was impeding the way that many residents got

Labuan Malaysia

around the area in their boats. For hundreds of years the residents drove their small boats under their houses and around the village. All of a sudden plastic pipes were in the way. A simple solution – cut them.

In 1995 our firm was hired by the Brunei and Australian governments to design and then supply a vacuum sewerage system for two main sections of Kampong Ayer at Bolkiah A and B. The sewerage was collected into sumps pinioned below the walkways to the houses and on average 4 houses was connected to each sump. Vacuum valves were housed in small stainless steel valve boxes attached to the side of the walkways to allow for easy operator access. All of the vacuum mains were laid under the walkways back to land where the vacuum pump station and treatment plant were located.

As the pipework was laid directly under the walkways it was not visible and did not impact on the passage of the residents. The number one lesson for residents was to learn not to use their toilet as a rubbish bin. Initially blockages were common and operators grew frustrated by the number of items thrown into the system. The problem residents were easily found as with only 4 houses connected to a sump, the process of elimination was easy and the residents were educated as to proper use. Modern valve monitoring systems will make this even easier.

Our engineers received an award from the Institute of Engineers Australia for this project. Our operations group still goes to site whenever requested the the government to ensure that the system continues to work well.

Head of Operations Peter Radinoff visiting Kampong Ayer

The lessons which both our engineers and operators learnt from these projects has enabled us to offer clients great insights in to how best design systems for water villages, resorts and marina’s. If you would like to learn more about other Flovac projects you can read about them here.  FLOVAC PROJECTS

 

 

 

 

 

 

 

Resort projects ideal for a vacuum sewerage system

 

 

Filed Under: Projects, Septic to Sewer Replacement Program Tagged With: Asia, Brunei, Environmentally Sensitive, Installation, Water Village

You Tube Video Library

How Vacuum Sewers Work

Flovac Valve Blockage Test

Vacuum Main Leak Test

Vacuum Valve Easy Access

 

Recent Posts

  • The Largest Vacuum Sewerage System in the Southern Hempisphere
  • How to identify 5,000,000 litres per year of salt water entering your sewer network at a single glance
  • Key Largo using monitoring for hurricane preparedness
  • The Most Difficult Install Ever, Eretrea Greece
  • Gran Marina del Estrecho, a new marina for megayachts